HWS Laboratory Event Log - Phase 3

7/21/14 BEGIN TESTING WITH 125 F THERMOSTAT SETTING, NREL/BA DRAW PROFILE SCHEDULE

8/14/14 OUTDOOR TANKLESS GAS DATA BEGINS

8/26/14 PROBLEMS WITH VALVE ON 40 GALLON STD GAS HEATER 8/18 - 8/22. VALVE CHANGED ON 8/25

9/1/14 PROBLEM WITH VALVE STUCK OPEN AFTERNOON CAPWRAP ELECTRIC TANK.

9/2/14 UPDATED NREL/BA HOT WATER GALLONS DRAW SCHEDULE FOR MONTH OF SEPTEMBER. Probelm with system #7 valve stuck 9:00PM

10/3/14 UPDATED NREL/BA HOT WATER GALLONS DRAW SCHEDULE FOR MONTH OF OCTOBER.

10/17/14 REPLACED SOLENOID VALVE ON 60 GAL HPWH. SOLENOID/DATA PROBLEMS 10/15 THRU 10/25 WATER RUNNING CONINUOUS.

10/24/14 AIRTAP PROGRAMMED FOR 8 DEGREE THERMOSTAT DEADBAND UNDER F12.